
Crew using the Re-Heat Process |
- Re-heat Process: All of our projects now use the reheat process. Half
the street can be kept open to traffic while the other lane is
completed. In a cross walk even half of the walk can be done at one
time minimizing traffic disruptions.
|
- Safety is increased when the crosswalk is distinctly marked
out in an intersection. Note how as a motorist you would use more
caution in this area. Ascetically pleasing with added safety, StreetPrint can easily be applied to existing intersections.
|

Intersection Showing Contrasting Walks |
- Continuous base: Because StreetPrint is applied to existing good
condition asphalt, the base water repelling layer is continuous.
Weeds and surface deformations from frost are minimized.
- Combine different patterns and color to create the look that says
you are proud of your city. While adding to safety in the
process.
|